V4 BCook Logbook
From SoftwarePractice.org
Contents |
August 2008
24 August 2008
Work Completed
- Added Stakeholder Identification - Developers.
-
- Added Stakeholder Identification - Radio Station Management.
-
- Edited System Narrative and Identification of key components/concepts.
Difficulties
Nothing of note\
Work to be done
- Stakeholder Identification - Technicians.
-
- Stakeholder Identification - Song Artists.
-
- Upload minutes from meeting 21/08/08
-
- Upload usage narratives, and Identify key conepts from them.
-
Time Taken: 1 hour
25 August 2008
Work Completed
- Uploaded minutes from meeting 28/08/08
-
- Updated logbook
Difficulties
Nothing of Note
Work to be done
- Stakeholder Identification - Technicians.
-
- Stakeholder Identification - Song Artists.
-
- Upload minutes from meeting 21/08/08
-
- Upload usage narratives, and Identify key conepts from them.
-
Total Time: 1.5 hours
27 August 2008
Work Completed
- Added Stakeholder Identification - Song Artists
-
- Added Stakeholder Identification - Technicians.
Difficulties
Nothing of note
Work to be done
- Upload usage narratives, and Identify key conepts from them.
-
Total Time: 30 minutes.
30 August 2008
Work Completed
- Added minutes from meeting 28/08/08.
Difficulties
Nothing of note
Work to be done
- Upload usage narratives, and Identify key conepts from them.
-
- Upload use case maps for usage scenarios of key stakeholders.
Total Time: 30 Minutes.
September 2008
1 September 2008
Work Completed
- Uploaded latest logbook entries.
Difficulties Am having alot of difficulty trying to create usage narratives for stakeholders who do not have any direct contact with the system.
Work to be done
- Upload usage narratives, and Identify key conepts from them.
-
- Upload use case maps for usage scenarios of key stakeholders.
Total Time: 30 Minutes
2 September 2008
Work Completed
- Uploaded new usage narratives
- Updated use case map descriptions
- Minor Cosmetic Changes
Difficulties
- None to note. Resolved existing problems through discussion with other group members.
Work to be done
- Add more usage narratives.
- Add use case maps and map descriptions.
- Add run-time quality attributes.
Total Time: 2 hours
4 September 2008
Work Completed
- Uploaded another usage narrative
- Minor editing changes.
Work to be done
- Add use case maps and map descriptions.
- Add run-time quality attributes.
Total Time: 0.5 hours
7 September 2008
Work Completed
- Uploaded Meeting Minutes: 04/09/08
- Added use case maps
- Added use case map explanations
Work to be done
- Add run-time quality attributes
Total Time: 3 hours
9 September 2008
Work Completed
- Fixed formatting issues
Work to be done
- Add run-time quality attributes
Total Time: 0.5 hours
10 September 2008
Work Completed
- Added run-time quality attributes.
Difficulties
- Run-time quality attributes did not appear to be well-defined as a concept. Took me a while to find a solid definition to use.
Work to be done
- Work on implementation of code for milestone 1.
Total Time: 2 hours
14 September 2008
Work Completed
- Committed a basic static web interface.
Difficulties
- Setting up jetty was a little more complicated than I hoped.
Work to be done
- Add JSP functionality to the web page.
Total Time: 5 hours
15 September 2008
Work Completed
- Fixed the directory structure.
Work to be done
- Add JSP functionality to the web page.
Total Time: 0.5 hours
18 September 2008
Work Completed
- Added limited JSP functionality to the web interface to allow some functionality.
- Updated the server to respond appropriately to the commands implemented in the web interface.
- Fixed up the batch scripts to launch the server and the console.
Difficulties
- Installing jetty on the uni computer labs and deploying the web page correctly into a war file on the web server.
Work to be done
- Add more advanced JSP functionality to the web interface.
- Add more functionality and tidy up the user consoles.
- Add more commands needed by the interfaces to the server.
Total Time: 5 hours
October 2008
16 October 2008
Work Completed
- Tidy up the JSP on the outputs management web page.
- Implement similar JSP functionality on the inputs management page.
Work to be done
- Tidy up the user consoles.
- Add more advanced functionality to the web interface.
- Implement more advanced functionality in the server.
Total Time: 2 hours
28 October 2008
Work Completed
- Fixed errors in the server code.
- Cleaned up the user console and added some additional functionality.
- Implemented some additional commands in the server to reflect the additional functionality in the user interface.
Difficulties
- Still waiting for the updated server to be committed. We have changed the way we process audio and handle connections, and parts of the protocol need to update to reflect this. I need this work to complete the user interface.
Work to be done
- Tidy up the user consoles.
- Add more advanced functionality to the web interface.
- More Advanced server implementation.
Total Time: 3 hours
29 October 2008
Work Completed
- Added arrays to the accepted parameter types.
- Fixed server bugs.
- Updated the GUI somewhat to reflect changes in the server.
- Near complete rewrite of the web interface to reflect the new server configuration and processing architecture.
- Added new commands to the server to allow better functionality in the web interface, and more dynamic querying of server properties.
Difficulties
- Jetty made it painful to develop jsp code, as the linux version is unable to give useful error messages, and throws a typecast exception trying to get them from object to jetty's internal error class.
Work to be done
- Add UI elements to allow access to the new eq filter.
- Add a reset button to demonstrate recoverability and hence availability as required by quality narratives.
- Write a critique of the architectural design.
- Write reflections.
- Check all other documentation related work is complete.
Total Time: 10 hours
30 October 2008
Work Completed
- Added new UI elements to demonstrate the equalisation filter.
- Checked the documentation and had a meeting to discuss what still needed changing before the deadline.
Work to be done
- Write a critique of the architectural design.
- Write reflections.
- Check all other documentation related work is complete.
Total Time: 2 hours
November 2008
4 November 2008
Work Completed
- Completed critique of the architectural design.
Work to be done
- Write reflections.
- Check all other documentation related work is complete.
Total Time: 4 hours
5 November 2008
Work Completed
- Uploaded reflections.
- Put all outstanding logbook entries online.
Work to be done
- Prepare for the presentation tomorrow night.
Total Time: 5 hours