V3 log smunro
From SoftwarePractice.org
Contents |
[edit]
Logbook
[edit]
Student Information
- Name: Steve Munro
- Student Number: 10434468
[edit]
Record Of Activity
[edit]
21.08.2008
- Attended group meeting.
- We decided to do the Emergency Response System as our project.
- We began determining the tasks that would lead need to be completed for Milestone 1.
- Rudimentary usage narratives developed.
- Difficulties:
- None.
[edit]
26.08.2008
- Created main wiki page.
- Created team management wiki page.
- Difficulties:
- None.
[edit]
28.08.2008
- Attended team meeting:
- During the team meeting, we discussed the allocation of different tasks to different team members. My tasks were to add the project specification and all of the narratives by 04.09.2008.
- Next team meeting to be held 04.09.2008
- Difficulties:
- None.
[edit]
03.09.2008
- Added the project specification under Introduction.
- Begun work on Stakeholder Narratives, completing narratives for Citizens, Emergency Phone Operators, Emergency Vehicles, State Government and Software Developers.
- Difficulties:
- None.
[edit]
04.09.2008
- Completed the stakeholder narratives, adding narratives for IT Support, System Designers and Management.
- Added Citizen Caller, Emergency Phone Operator and State Government usage narratives.
- Added quality narratives on the identified most important qualities, performance and reliability.
- Attended 3rd group meeting:
- Was tasked with developing the rudimentary interface for our project.
- We split up the different coding modules between different team members, and also tasked different team members with the rest of the documentation for Milestone 1.
- Difficulties:
- None.
[edit]
05.09.2008
- Installed the Eclipse SDK:
- Installed Subclipse as well (the add on that handles svn).
- Difficulties:
- None.
[edit]
06.09.2008
- Coding the interface for our project.
- There needs to be to separate main interfaces; one for our phone operators/admin and one for the vehicles themselves.
- They will all inherit from a GUI superclass.
- Login screen will handle user authentication and security. This is also the point where the particular interface for each user is loaded.
- Difficulties:
- None.
[edit]
07.09.2008
- Have finished basic interfaces for the SplashForm, LoginForm, AboutForm, VehicleForm
- Difficulties:
- Most problematic thing with coding the user interface is getting the positioning correct. It is not a halting difficulty, but is simply one of the joys of coding in a non-visual environment.
[edit]
10.09.2008
- Attended group meeting:
- We developed the operator ui,
- Devised the presentation order, and assigned team members to specific tasks in relation to producing the presentation deliverable,
- Assigned each time member further tasks for the Milestone 1 deliverable.
- Edited main wiki page for responsibilities, fixing wiki syntax, and minor grammar checks.
- Added Security Quality Narrative.
- Developed my slides for presentation.
- Difficulties:
- No major difficulties.
[edit]
11.09.2008
- Group met up to help finalise the Milestone 1:
- I fixed the formatting of all of the tables on our wiki.
- Helped team members develop further documentation.
- Difficulties:
- Nothing today.
[edit]
18.09.2008
- Worked on application for presentation.
- Helped present application to tutor, highlighting key quality attributes that have been started to be addressed.
- Group met up to assess progress on application.
- Difficulties:
- None so far.
[edit]
23.10.2008
- Continued work on interface of prototype.
- Difficulties:
- None so far.
[edit]
28.10.2008
- Group met to work on executable prototype.
- Worked on interface.
- Difficulties:
- None so far.
[edit]
29.10.2008
- Continued implementing executable prototype.
- Difficulties:
- None.
[edit]
30.10.2008
- Finished executable prototype, working on finishing the interface and also implementing some of the protocol.
- Demonstrated executable prototype to lab tutor.
- Feedback was positive on what the system has resulted as.
- Difficutlies:
- Difficulty in creating a package that is identacally named as each element of the architectural views.
[edit]
6.11.2008
- Worked on wiki for final submission.
- Helped develop the powerpoint slides for final presentation.
- Difficulties:
- None.
[edit]
Quick Reflection
I found this subject to be highly useful in helping me to realise that software really needs to be carefully implemented, and that correct analysis can provide a truly superior end result.
I got the opportunity to work in a team that had a range of skills that we were able to utilize, particularly my own in interface design, Peter Perera's in implementing the server, Tim Mifsud's in handling mapping issues for our prototype, Rachelle Gharios' and Smita Pati in database development and implementation and Denish Ardeshna in applying certain patterns and styles to our work.
Back To Team Management page