V3 Team Management

Team Members

Student Number Student Name Logbook
10434456 Tim Mifsud Logbook
10434468 Steve Munro Logbook
10461111 Peter Perera Logbook
10470666 Rachelle Gharios Logbook
10506362 Smita Pati Logbook
10550212 Denish Ardeshna Logbook

Note: Table appears in descending numeric order.

Meeting Minutes

Meeting Date: 21st August 2008 Minute Taker: Peter Perera Duration: 45min
  • a system was decided upon (Emergency Response)
  • Contact Details were exchanged
  • Started determining the tasks required to reach Milestone


Meeting Date: 28th August 2008 Minute Taker: Peter Perera Duration: 90 min
  • Continued determining the tasks required to reach Milestone
  • Allocate tasks + set Task completion dates


  • Rachelle
    • Stakeholders
    • Importance
    • Matrix
  • Steve
    • System Narrative
  • Denish
    • Architectural View
    • Software Architectural Description
  • Peter
    • System Purpose
  • Tim
    • System Context
  • Smita
    • Usage Scenarios (use-case maps)



Meeting Date: 4th September 2008 Minute Taker: Peter Perera Duration: 120 min
  • analysed conceptual and execution architectures..realised weakpoints in the system that need to be addressed
  • split up coding components
  • system requirements
    • mathematical formula for determining closest vehicle to the scene (distance between two points formula)
    • database interactions
    • interface
      • Add SQL interaction
        • AddNewDB
        • DelDB
        • Search
      • HTTP interaction
      • User-System (Interface)
      • System-Vehicle Interaction
    • Add/Suspend Vehicle

Suggestions by tutor...to look into

  • FreeMarker
  • JETI
  • Coding Taskings
    • Steve - Interface
    • Peter - HTTP (Client and Server)
    • Tim - Research Mapping(Google API)
    • Rachelle - SQL
    • Smita - SQL
    • Denish - SQL + Interface (connecting)
  • Documentation
    • Denish & Smita - Conceptual Architecture (Finalise)
    • Denish - Execution Architecture (Finalise)
    • Peter - Execution Architecture Drawing


Meeting Date: 10th September 2008 Minute Taker: Tim Mifsud Duration: 90 min
  • Discussed recently completed tasks and tasks yet to be completed
  • Delegated presentation tasks and material
    • created rough outline of presentation slides (see below)
  • Sketched design for remaining ERMS forms to be coded
  • Set deadlines for assigned tasks

  • Presentation Slides
    • Steve - Introduction and Quality Narratives
    • Peter - Description and Execution Architecture
    • Tim - Contextual Factors and Conclusion
    • Rachelle - Key Stakeholders
    • Smita - Use Case Diagrams
    • Denish - Conceptual Architecture and Issues